Skip to main content

Hilton Head Builders

Let's Build Your Dream Together

Building a custom home in Shipyard Plantation

Shipyard Plantation sits on the south end of Shipyard Plantation, wrapped around three golf courses and a stretch of oceanfront that has drawn homeowners since the plantation was developed in the 1960s and 70s. It is a mature, heavily wooded community with a mix of full-time residents and second-home owners, and lots here range from interior home sites shaded by live oak and pine to properties closer to the ocean side of the plantation. Building a house in Shipyard is not the same project as building on a bare lot in Bluffton or Okatie. The tree cover, the setbacks, and the architectural review process all shape the house before a single footing is poured.

What building here actually involves

Most Shipyard lots are interior or golf-course adjacent, with a smaller number closer to the ocean side of the plantation. Tree preservation is a real factor almost everywhere in the community. Grand oaks and mature pines are part of what makes Shipyard feel established, and site plans have to account for protected trees, root zones, and canopy before the footprint of the house is even settled. That often means the buildable envelope on a given lot is smaller than the lot line suggests, and it changes how a floor plan gets laid out.

Elevation and drainage matter too. Shipyard was developed with a network of lagoons that both define views and handle stormwater, so finished floor elevations, grading, and foundation type are worked out early with a site engineer rather than assumed from a stock plan. Architecturally, Shipyard has always leaned toward Lowcountry and coastal forms, rooflines and materials that read as settled rather than showy, which fits how the ARB evaluates new construction. Most homes here are either full-time residences for owners who have already been on the island for years or well-used second homes, not spec houses, and that shows in how carefully owners approach the design phase.

Walk the lot

Before any design work, we walk the specific Shipyard homesite, review the tree survey, and confirm drainage and setback conditions that will shape the buildable envelope.

Confirm ARB requirements

We review Shipyard's current architectural guidelines for the lot in question so design work starts within what the ARB is actually looking for, rather than being reworked later.

Design and engineering

Floor plans, elevations, and site engineering are developed together, accounting for tree protection, flood elevation where relevant, and the architectural character the community expects.

ARB submission and approval

Completed plans go to the Shipyard Architectural Review Board for formal review. We build the time this takes into the overall project schedule rather than treating it as a formality.

Construction with open-book costs

Once approved, construction proceeds under the flat-fee, open-book model, with the owner able to see actual project bills as work progresses.

Ed Flynn has been building custom homes on Shipyard Plantation and in the surrounding Lowcountry for decades. Whether or not a specific project has been built inside Shipyard Plantation, the site conditions, tree ordinances, and review expectations that come with the community are familiar territory from work across the island. What follows is a straightforward look at what building here involves and how we approach it.

The review and approval process

Shipyard Plantation has an Architectural Review Board, and its guidelines are binding on all property owners in the community. Nothing gets built, and in many cases nothing gets significantly altered on an existing home, without ARB review and written approval before construction starts. The board looks at siting, massing, exterior materials, roof form, color, and how the house relates to trees and neighboring lots. It is a real approval process with real authority, not a rubber-stamp committee.

The practical effect for an owner is that design work has to be substantially resolved, and often engineered, before submission. Revisions after a rejected or conditionally approved submission cost time, so the plans that go in front of the ARB need to already reflect tree surveys, setback compliance, and the architectural character the board expects to see in Shipyard. We treat that submission as part of the build schedule, not a formality tacked onto the end of design, and we build in the lead time it takes to get it right the first time.

Lots and homesites

Shipyard lots vary more than they might appear from the road. Some interior sites are flat and heavily wooded with straightforward buildable envelopes once tree protection is mapped. Others back up to a lagoon or golf fairway, which affects both the view and the drainage plan. A smaller number of lots sit closer to the ocean side of the plantation, where flood elevation and wind design requirements are more involved. Before any design work starts, we walk the specific lot, review the tree survey and any prior ARB history on the site, and confirm what the buildable area actually allows. That groundwork changes what a floor plan can and should look like, and it is worth doing before an architect starts drawing.

How we work

Our fee is flat, agreed before construction starts, and not tied to a percentage of the job cost. That structure removes the incentive that a percentage-based fee creates, where a builder benefits when the project gets more expensive. Alongside that, clients see the actual bills and subcontractor invoices as the project runs, not a summarized draw request. Funds for the project sit in a separate project account rather than mixed with other work. None of this is a discount model or a way to build cheaper. It is a way to give an owner spending seven figures on a house full visibility into where the money is going and control over decisions as they come up. The full explanation of how the model works is here.

For a Shipyard project specifically, that visibility matters in a community where tree protection, drainage, and ARB conditions can generate change orders if they are not planned for correctly up front. An open-book cost structure means those items are visible as they happen, not discovered at closeout.

Design decisions in Shipyard tend to move at the pace of the ARB review cycle rather than the pace of the builder, and that is worth planning for from the start. An owner who accounts for review time in their overall timeline generally has a smoother experience than one who expects construction to start the week drawings are finished.

Because Shipyard is an older, established plantation, it is also common to encounter existing homes on a lot that are being replaced rather than a truly vacant site. Demolition, tree protection during demolition, and utility relocation all become part of the early project sequence in those cases, and they need to be scoped and reviewed alongside the new home design, not treated as an afterthought.

Golf course frontage in Shipyard comes with its own set of ARB considerations around setbacks from cart paths and sightlines, which is worth flagging early if a lot borders one of the three courses.

We also encourage owners to talk with their homeowners association and confirm any community-specific requirements around construction hours, staging, and contractor parking before the project starts. Shipyard is a gated, occupied community during construction, and working within its rules on access and site conduct is part of being a good neighbor for the length of the build.

Large-scale renovation work, generally projects at $500,000 and above, follows the same review path in Shipyard as new construction when the scope affects the exterior of the home. That includes additions, roofline changes, and significant footprint changes, all of which go back through the ARB before work begins.

What it costs

Custom homes we build across Shipyard Plantation, Bluffton, and Okatie typically fall in the $1.5 million to $2.5 million range, and Shipyard projects generally sit within that same range depending on lot conditions, size, and finish level. We do not publish a build duration or a fixed timeline because every lot and every ARB review cycle moves differently. What we can say plainly is how the fee works: a flat builder fee set before construction starts, not a percentage of the job. That number is discussed directly, house by house, once a lot and a design direction are in front of us.

Talk to us about your lot

If you own a homesite in Shipyard Plantation or are looking at one, the most useful next step is a direct conversation about the specific lot, the tree survey, and what the ARB will expect for that address. Ed Flynn works these conversations directly rather than handing them off. Call {PHONE} or reach out through the site to start with your lot.

FAQs

Does Hilton Head Builders have experience building specifically inside Shipyard Plantation?

We build across Shipyard Plantation, Bluffton, and Okatie and are well versed in the tree preservation rules, drainage conditions, and ARB review process that apply in Shipyard. We will always tell you plainly whether a specific past project was inside the plantation gates rather than imply a build history that does not exist.

Shipyard Plantation has an Architectural Review Board, and its guidelines are binding on all property owners. New construction and most significant exterior renovations require ARB review and written approval before work can begin.

No. Tree cover, lagoon frontage, golf course setbacks, and proximity to the ocean side of the plantation all affect the buildable envelope differently lot to lot. We walk the specific lot and review its tree survey and site conditions before design work starts.

The fee is agreed before construction starts and does not change based on the cost of the job, unlike a percentage-based fee that rises as the project gets more expensive. Clients see actual project bills as the job runs, and project funds are held in a separate account.

Large-scale renovations, generally $500,000 and above, are something we take on when the scope and the lot support it. Exterior changes still go through the same ARB review as new construction.